Phone:(880-2)-55010300 Fax:(880-2)-8113010, 9144030

Former Micro Finance Programme of Dhaka Ahsania Mission

DAM Foundation for Economic Development

[An Institution of Dhaka Ahsania Mission]

Our Inspiration

Khan Bahadur Ahsanullah (R.)

DFED

Our Inspiration

 The DAM Foundation for Economic Development (DFED) was founded by Dhaka Ahsania Mision in 2014

Dhaka Ahsania Mission is a non-profit voluntary organization in Bangladesh. The Mission was established in 1958 by Khan Bahadur Ahsanullah, an outstanding educationist and social reformer of undivided India. With his own vision of a better society, characterized by a wealth of moral and spiritual values of the highest humanism that are universally acclaimed through ages and manifested in every sphere of life social, economic and cultural; and access to education and resources, he established the Mission. His remarkable educational reforms include among others introduction of roll number system in the public examination and creating equal opportunity for education of all groups of people in the society.

Besides, he has contributed to the society by writing a large number of books covering a wide range of areas from human and social life, history, human development, literature, religion, biography, moral values etc.

Though initially charity and welfare activities were the major focus of the Mission agenda, it has expanded its arena of activities leaning towards sustainable development strategies with the passage of time since early 1980s.

k_b_ahsanullah

  The Inspiration of the DFED
Hazrat Khan Bahadur Ahsanullah (R) M.A., M.R.S.A., I.E.S. (1873 1965), was the Assistant Director of Public Instruction for Bengal  and Assam Provinces of undivided  India (1925-29) .